Next place a ladder at the left side of the house and measure from the roof down to the gutter.
Revit gutter adjust slope.
For example if the gutter is 16 feet long the end near the down spout must be 1 inch lower than the starting end.
This means the downspout end of the gutter should be set 3 4 of an inch lower than the other end.
Only the chain of edges can be selected for the roof.
Model your roof in this example a skillion roof with 45 degree edge.
When you press tab revit cycles through available selections and then highlights the chain of edges.
Then use a pencil to make a mark.
How to adjust drainage slope of flat roof.
Or another option is add another down pipe in the area where is affected.
You can select either the inside or outside edge of the top of the fascia that is present.
Modify sweep ribbon pick path.
For example if you have 30 feet of guttering the calculation is 1 4 x 3 0 75 i e.
How much of the gutter are you wanting fall.
Get on a ladder after a rainstorm and look in the gutter.
Working out gutter slope as a general rule gutter slope is set at 1 4 inch per 10 feet of guttering.
Pull the gutter down about 3 quarters of an inch lower than it originally was.
You can also select the lower outside edge of the fascia.
At the downspout end of the length of gutter and from the top of the fascia measure the amount of slope needed.
Create ribbon sweep.
If there s standing water it s not pitched properly.
To correct this yourself you ll need to measure from the peak to the downspout.
Gutters need to be pitched toward the downspouts for the water to flow properly.
You want at least a quarter inch of slope for every 10 feet.
If it is improperly pitched you will need to adjust the gutter slope.
Put a temporary screw at the back to adjust the pitch.
Remove no more than three hangers.
Ask someone to hold the gutter while you loosen and remove the gutter brackets or hangers.
Multiply the number of feet by 1 16 inch to determine the total slope the gutter requires.