The floor does not have a screeded surface but is power floated to a smoothish albeit uneven finish the reason for removing the bitumen is so i can re level the.
Removing bitumen from concrete floor.
When removing an existing floor bitumen is easily identified as a black substance that is firmly adhered to the screed remaining behind after the floor covering is removed.
Then use the flat side of a 12 in.
Remnants and residues left over aren t pleasant to look at and make it impossible to add new decor or refinish to the concrete.
Due to the nature of bitumen it seeps into the screed and is therefore very difficult to remove.
If you can t get it all don t worry.
Job as it takes a fine top layer of the concrete finish off but it s tedious and hurts.
Tar is probably the last substance you d expect to come up easily from any surface let alone concrete but you re about to be pleasantly surprised.
After you remove the tiles chisel and scrape the adhesive off the concrete as well.
Layer of latex thin set mortar over the floor.
Trowel to apply a 1 8 in.
You can achieve professional results with relative ease by following this advice for cleaning virtually any mess from concrete.
Concrete floors aren t the eyesore they used to be.
Before you begin make sure you read the label directions and wear protective gear including.
And if the people applying it aren t careful it can get onto concrete and create an unsightly difficult stain.
You can leave bits of adhesive up to 1 8 in.
A word of advice.
However if you do this odds are that some adhesive will be left behind in the process.
There are plenty of methods for decorating them that can make you want to pull up old carpet and tiling in an instant.